Jim Elliot Christian School and CUSP, Flood Rehab & Mitigation

Loading Map....

Date/Time
Date(s) - 09/15/2016
9:30 am - 1:30 pm

Location
Park County Offices

Category(ies)


Jim Elliot Christian School & CUSP

Flood Rehab & Mitigation

 

 

Workdays: Thursday, September 15th, 2016

Project Location: Park County Offices, 59961 US-285, Bailey, CO 80421

Difficulty Rating: Easy/Moderate

Project Times: 9:30am-1:30pm

Map Link: https://goo.gl/ZSLCqy

 

 

Workday Description:

Areas become more prone to flooding after a fire. We will help to clear excess mud from a public area, as well as mitigate against future flooding. Jute matting will help keep sediment in place. This area is especially important because it’s behind a sheriff’s office and other public works facilities. Clearing this area will make the county safer for everyone, as we will be ridding the county of this extra obstacle.

 

 

Important Notes:

 

  • CUSP will provide hardhats, materials and necessary tools to complete project work
  • Due to variable weather conditions and safety for our volunteers all vehicles and drivers must remain onsite for the duration of the project
  • A portable restroom will be available on site
  • A safety review and work demonstration will precede the project work
  • Weather, which could create hazardous conditions, may cause the project to be canceled or rescheduled; staff will monitor weather and notify you of any changes, which will also be posted to this page

 

Requirements of Volunteers:

All volunteers must complete and submit prior to the project:

CUSP-2016-Release-Form (needed for each volunteer, please print double sided)

VOLUNTEER-LISTING-2016 (1) (one for your group, one for each project)

 

 

Please Bring:
A daypack to carry water and lunch

Refillable water bottle (We will have Igloo containers available for refills)
Any applicable medicines (including epi-pens, insulin and inhalers)
Sunscreen
Sunglasses or safety glasses
Long pants and long sleeved shirts are strongly recommended
Work gloves (we will have some if you do not)
Sturdy shoes with good tread; no sandals please
What to Expect:
This project will occur in an exposed mountain environment. Please be aware and prepared for potential hazards, including but not limited to: driving on mountainous roads with loose gravel and snow; exposure to sun, wind, lightning and rapidly changing weather conditions; working with sharpened tools in areas with unstable terrain and footing; working at significant elevation. Medications may have adverse effects in sun, heat, cold or altitude; please list medications and medical conditions on the CUSP release form so staff may be aware of potential concerns. Dress appropriately for cold weather, including proper footwear. Know your limitations and inform staff immediately if you become ill or injured. Be prepared to exit quickly in the event of an emergency or changing environmental conditions.  Please drink plenty of water prior to and during the project to stay hydrated.

 

 

GPS systems and Internet map sites are often misleading in the mountains. Cell phone service will be inconsistent or unavailable.

The Coalition for the Upper South Platte

Post Office Box 726

Lake George, Colorado 80827

719.748.0033

www.cusp.ws

Bookmark the permalink.